Skip to content

LAX In-Line Baggage Screening System (Terminals 5, 7 & 3)

Description: This was a highly specialized project. The scope of services for the in-line Explosive Detection Screening (EDS) baggage project at LAX included converting the existing checked-baggage screening system into a state-of-the-art automated system incorporating sophisticated explosive-detection equipment, conveyors, and sorting systems.

The project also included development of the supporting infrastructure and replacement facilities required for the modification.

The principal challenge was phasing the new system into operation while maintaining continuous passenger service and uninterrupted operation of the existing baggage-handling system.

AVA’s Role: AVA provided architectural design services for the preparation of 100% construction documents for the in-line baggage-handling system at Terminals 5, 7, and 3, which served as a prototype for the other terminals.

AVA also provided construction administration services for Terminal 3.

AVA’s Fee: $900,000 Completion: 2010

Design / Construction Administration

  • Client

    Los Angeles World Airports (LAWA)

Connect with Us

Let’s Build the Future Together

Whether you have a project in mind or just want to learn more about our services, we’re here to help. Contact us today to discuss how we can bring your vision to life.

Contact Us