Alameda Corridor East Grade Separation Project – Puente Avenue Grade Separation
Alameda Corridor East Grade Separation Project
Anil Verma Associates, Inc. (AVA) was part of the LAN Engineering team selected to perform Construction Management services for four grade separation projects as part of the Phase I ACE Project. AVA’s responsibilities included inspection, office engineering, and field engineering.
The ACE Project was a corridor-wide improvement program aimed at reducing vehicular congestion at railroad crossings and improving safety and mobility at 44 grade crossings, and at constructing 21 grade separations from East Los Angeles at Redondo Junction to Pomona in Los Angeles County, over a distance of 35 miles. The improvements were intended to reduce the impacts resulting from crossings of the Union Pacific Railroad (UPRR). The ACE Project serves an area of approximately 1.8 million residents and 30 municipalities, and connects the ports of Los Angeles and Long Beach to the transcontinental rail network.
Puente Avenue Grade Separation ProjecT
AVA’s Role: AVA is providing construction management services, with responsibilities for inspection and safety oversight. AVA performs overall inspection and coordination for construction of the project scope described below and coordinates its services with the Union Pacific Railroad (UPRR), the City of Industry, the Los Angeles County Department of Public Works, the Los Angeles County Sanitation District, and numerous utility companies, including Edison, AT&T, Verizon/Frontier, Time Warner, and Southern California Gas.
Description: The Puente Avenue Grade Separation Project is located within the Union Pacific Railroad (UPRR) Alhambra Subdivision in the City of Industry, along Puente Avenue at milepost (MP) 498.20. The grade separation is located between Valley Boulevard to the south and Nelson Avenue to the north, where Puente Avenue is lowered beneath the UPRR tracks. The project includes construction of a bridge structure carrying Valley Boulevard over Puente Avenue within an unincorporated area of Los Angeles County. The project scope includes sewer improvements; utility casing beneath the UPRR tracks; pile installation; retaining wall construction; waterline installation; a sewer siphon with airline; installation of steel girders for the UPRR structure; roadway excavation; construction of the concrete structure for the Valley Boulevard bridge; street lighting; landscaping and irrigation; storm-drain realignment; protection of the Los Angeles County Flood Control District’s Avocado Creek drainage facility; and signing, striping, and traffic control.