Alameda Corridor East Grade Separation Project – Brea Canyon Road Grade Separation
Alameda Corridor East Grade Separation Project
Anil Verma Associates, Inc. (AVA) was part of the LAN Engineering team selected to perform Construction Management services for four grade separation projects as part of the Phase I ACE Project. AVA’s responsibilities included inspection, office engineering, and field engineering.
The ACE Project was a corridor-wide improvement program aimed at reducing vehicular congestion at railroad crossings and improving safety and mobility at 44 grade crossings, and at constructing 21 grade separations from East Los Angeles at Redondo Junction to Pomona in Los Angeles County, over a distance of 35 miles. The improvements were intended to reduce the impacts resulting from crossings of the Union Pacific Railroad (UPRR). The ACE Project serves an area of approximately 1.8 million residents and 30 municipalities, and connects the ports of Los Angeles and Long Beach to the transcontinental rail network.
Brea Canyon Road Grade Separation
AVA’s Role: Anil Verma Associates, Inc. (AVA) was part of the engineering team responsible for providing construction management services for this project. AVA’s responsibilities included inspection, safety engineering, and field engineering.
Description: The Brea Canyon Road Grade Separation Project required lowering Brea Canyon Road beneath the existing railroad tracks and constructing a railroad bridge to carry trains over the roadway. Portions of Washington Street and Currier Road were also lowered at their intersections with Brea Canyon Road. The reconfigured Brea Canyon Road includes several pedestrian and motorist safety improvements, including walkways with protective railings.