Skip to content

Los Angeles Trade Technical College (LATTC) Modernization Projects

The Los Angeles Trade Technical College

The LATTC modernization efforts transformed the campus through several significant projects, including new buildings, restorations, and infrastructure improvements. These projects were funded under the $2.1 billion Proposition A/AA and $3.5 billion Measure J bond programs, designed to accommodate increased student enrollment and enhance sustainability.

Campus Project Management

Anil Verma Associates, Inc. (AVA) served as Campus Project Manager, overseeing planning, design, and construction across multiple concurrent projects and managing quality control, budget, schedule, and sustainability requirements. The program delivered six LEED-certified buildings along with advanced learning and support spaces.

Key Projects:

  1. South Campus Project

    • Two five-story LEED Platinum buildings housing classrooms, lecture halls, and student services.
      • Role: Managed all phases from design through construction.
      • Cost: $99.7 Million
      • Timeline: 2002–2014
  2. Learning Resource Center (LRC)

    • An 82,000-square-foot library renovation with a 15,000-square-foot expansion for enhanced student services.
      • Role: Managed design and construction.
      • Cost: $39 Million
      • Timeline: 2007–2015
  3. Child Development Center (CDC)

    • A 14,500-square-foot LEED-certified building with classrooms, offices, and playgrounds.
      • Role: Delivered project management and sustainability compliance.
      • Cost: $10.6 Million
      • Timeline: 2002–2012
  4. Building ’A’ Modernization & Restoration

    • A 100,000-square-foot historic building upgraded to LEED Silver standards with seismic retrofits.
      • Role: Directed design and construction management.
      • Cost: $67.5 Million
      • Timeline: 2007–2017
  5. Construction Technology Building (CTB)

    • A 160,000-square-foot, three-story LEED Gold building with modern classrooms and laboratories.
      • Role: Managed the design-build process and construction.
      • Cost: $120 Million
      • Timeline: 2008–2023
  6. East Parking Structure (EPS)

    • A six-level, net-zero-energy structure providing 1,000 parking spaces with sustainable design features.
      • Role: Oversaw the design-build process and project execution.
      • Cost: $20 Million
      • Timeline: 2009–2016
  7. Culinary Arts Facility

    • A 50,000-square-foot facility supporting LATTC’s Culinary Arts program.
      • Role: Coordinated programming and design services.
      • Cost: $33 Million
      • Timeline: 2006–2019

Project & Construction Management

  • Sustainability Leadership

    Achieved LEED certifications for six buildings

  • Diverse Projects

    Delivered state-of-the-art academic, administrative, and recreational facilities

  • Historic Restoration

    Balanced modernization with preservation of historic structures

  • Client

    LACCD - Los Angeles Community College District

Connect with Us

Let’s Build the Future Together

Whether you have a project in mind or just want to learn more about our services, we’re here to help. Contact us today to discuss how we can bring your vision to life.

Contact Us