Los Angeles Trade Technical College (LATTC) Modernization Projects
The Los Angeles Trade Technical College
The LATTC modernization efforts transformed the campus through several significant projects, including new buildings, restorations, and infrastructure improvements. These projects were funded under the $2.1 billion Proposition A/AA and $3.5 billion Measure J bond programs, designed to accommodate increased student enrollment and enhance sustainability.
Campus Project Management
Anil Verma Associates, Inc. (AVA) served as Campus Project Manager, overseeing planning, design, and construction across multiple concurrent projects and managing quality control, budget, schedule, and sustainability requirements. The program delivered six LEED-certified buildings along with advanced learning and support spaces.
Key Projects:
-
South Campus Project
- Two five-story LEED Platinum buildings housing classrooms, lecture halls, and student services.
- Role: Managed all phases from design through construction.
- Cost: $99.7 Million
- Timeline: 2002–2014
- Two five-story LEED Platinum buildings housing classrooms, lecture halls, and student services.
-
Learning Resource Center (LRC)
- An 82,000-square-foot library renovation with a 15,000-square-foot expansion for enhanced student services.
- Role: Managed design and construction.
- Cost: $39 Million
- Timeline: 2007–2015
- An 82,000-square-foot library renovation with a 15,000-square-foot expansion for enhanced student services.
-
Child Development Center (CDC)
- A 14,500-square-foot LEED-certified building with classrooms, offices, and playgrounds.
- Role: Delivered project management and sustainability compliance.
- Cost: $10.6 Million
- Timeline: 2002–2012
- A 14,500-square-foot LEED-certified building with classrooms, offices, and playgrounds.
-
Building ’A’ Modernization & Restoration
- A 100,000-square-foot historic building upgraded to LEED Silver standards with seismic retrofits.
- Role: Directed design and construction management.
- Cost: $67.5 Million
- Timeline: 2007–2017
- A 100,000-square-foot historic building upgraded to LEED Silver standards with seismic retrofits.
-
Construction Technology Building (CTB)
- A 160,000-square-foot, three-story LEED Gold building with modern classrooms and laboratories.
- Role: Managed the design-build process and construction.
- Cost: $120 Million
- Timeline: 2008–2023
- A 160,000-square-foot, three-story LEED Gold building with modern classrooms and laboratories.
-
East Parking Structure (EPS)
- A six-level, net-zero-energy structure providing 1,000 parking spaces with sustainable design features.
- Role: Oversaw the design-build process and project execution.
- Cost: $20 Million
- Timeline: 2009–2016
- A six-level, net-zero-energy structure providing 1,000 parking spaces with sustainable design features.
-
Culinary Arts Facility
- A 50,000-square-foot facility supporting LATTC’s Culinary Arts program.
- Role: Coordinated programming and design services.
- Cost: $33 Million
- Timeline: 2006–2019
- A 50,000-square-foot facility supporting LATTC’s Culinary Arts program.