Purple Line Extension Section 2 Project, Construction Management Support Services

Client: Los Angeles County Metropolitan Transportation Authority (LACMTA)
Size: 9 mile Heavy Rail Subway Extension from Wilshire/Western Station to Westwood/VA Hospital, 7 New Stations
Duration Date: April 26, 2017 – On going

Description

Purple Line Extension Section 2 is defined by twin-bored tunnels with connecting cross passages that convey the guideway between two stations.  There are two stations along this alignment.  Tunnel Reach 4 is between the tunnel interface west of Wilshire/La Cienega Station and Wilshire/Rodeo Station (Rodeo Station).  Tunnel Reach 5 is between Wilshire/Rodeo and Century City/Constellation Stations (Constellation Station).  The subway tunnels will run beneath Beverly Hills High School and the AAA building between the Rodeo and Constellation Stations.